Sign In | Join Free | My howtoaddlikebutton.com
China Guangdong Fullde Electrical Technology Co., Ltd logo
Guangdong Fullde Electrical Technology Co., Ltd
Guangdong Fullde Electrical Technology Co., Ltd
Active Member

8 Years

Home > Generator Load Bank >

AC415V 35KW Electrical Testing Load Bank for Generator Continuous Duty Cycle

Guangdong Fullde Electrical Technology Co., Ltd
Contact Now

AC415V 35KW Electrical Testing Load Bank for Generator Continuous Duty Cycle

  • 1
  • 2
  • 3

Brand Name : Fullde

Model Number : LB-AC415V-35KW

Certification : CE, ISO9001

Place of Origin : Dongguan,China

MOQ : one set

Price : US $3,000 - 10,000 / Set

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 100 Set/Sets per Month

Delivery Time : 25 working days

Packaging Details : Wooden packaging,Carton packaging

Power : Electronic

Usage : Auto Testing Machine

Rated Power : 0--1100KW

Rated Voltage : 110-480 VAC

Frequency : 50HZ/60HZ

Duty Cycle : Continuous

Power Factor : PF = 1.0 or 0.8

Power Range : 100KW to 2000KW

Cooling Mode : Forced Air-Cooled

Application : Generator,UPS,Battery

Contact Now

Fullde AC415V 35KW Power Factor 1.0 Electrical Testing Load Bank for Generator

1. Technical standards
FULLDE provide the equipment and accessories which meet the following standards, but not limited to the following criteria:
1) National standards: GB/T 14048.1-2000
Low-voltage switchgear and control equipment


2) National standards: GB/T 7251-2005
Low-voltage complete switch and control equipment

3) Industry standard: JB/T 9696.1-1999
Low-voltage complete switch and control equipment with terminal row


4) IEC 60034 Rotating Electrical Machines


5) IEC 60364 Low Voltage Electrical Installations


6) IEC 60664 Insulation Coordination for equipment within low-voltage systems


7) IEC 60529 Degrees of protection provided by enclosures (IP Code)


8) NFPA 110 Standard for Emergency and Standby Power Systems

2. Conditions
1) Ambient temperature: - 25 ~ 55 ℃


2) The relative humidity: average less than 90%


3) Altitude: ≤2500m


4) The installation conditions: without corrosive or flammable gas, water vapor etc some other
obvious pollution, and without violent vibration.

3. Equipment technical parameter

System Composition Resistor, air cooling, the electric parameters testing, control panel
Resistor Element Special alloy resistance, high temperature resistance, corrosion resistance, high precision, long service life, resistance tolerance is ±5%;
Connection The three-phase four wire system, star connection method, copper;
Control Contactor
Control Voltage 3P4W, 415VAC,50Hz;
Dimension(mm) 750*850*1300mm;
Weight about 100KG
Load element type Pure resistive
Control Local manual control;
Load Tolerance ±5%;
Way of Working Continuous working;
Cooling type Force air cooling;
Insulation grade F;
Protection

1. Emergency Stop: User can press the emergency stop button in the panel to unload immediately when the load bank is abnormal while working;

2. Short Circuit Protection: Fuse could avoids damage to equipment when short circuit or current overload;

3. Fan Air Quantity Protection: when the wind is insufficient, the machine will unload and give alarm;

Protection Button there are protection button both in local control and remote control can be switched off when false alarm or for special requirements.
Protection Grade IP23;
Transportation Rings on the top or caster wheels;

4. Control Panel Introduction

AC415V 35KW Electrical Testing Load Bank for Generator Continuous Duty Cycle


Product Tags:

generator testing load bank

      

portable generator load bank

      
Wholesale AC415V 35KW Electrical Testing Load Bank for Generator Continuous Duty Cycle from china suppliers

AC415V 35KW Electrical Testing Load Bank for Generator Continuous Duty Cycle Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangdong Fullde Electrical Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0